Hampton VAMC
Comprehensive Campus Survey & Sanitary Sewer Rehabilitation
84
Acres
Hampton VAMC
Hampton, VA
(ongoing)
Honor Engineer Co. has performed as the prime contractor to provide surveying services for Hampton VAMC's 84-acre medical facility. Honor performed on two separate survey contracts including a boundary, topographic, and subsurface utility engineering survey. These surveys encompassed methodologies such as ALTA/NSPS Land Title standards, aerial photography, LiDAR acquisition, GIS services and more. Honor is currently performing a sanitary sewer rehabilitation project to improve the campus infrastructure.
PROJECT
key features
size
84-acre VA Medical Campus
goal
Survey entire medical campus and utilize findings/recommendations to improve infrastructurehighlight
Honor received positive CPARS for survey efforts at this medical campus and has performed on three separate contracts
get in touch
contact us
Ready to connect with Honor?
Fill out the form and a team member will reach out.